Hyperion i4 Global Solutions
Hyperion i4 Global Solutions
  • Home
  • About Us
  • Internal CFD
  • External CFD
  • Contact Us
  • Internal CFD Analysis
  • External CFD Analysis
  • More
    • Home
    • About Us
    • Internal CFD
    • External CFD
    • Contact Us
    • Internal CFD Analysis
    • External CFD Analysis
  • Home
  • About Us
  • Internal CFD
  • External CFD
  • Contact Us
  • Internal CFD Analysis
  • External CFD Analysis

Past Projects: Internal CFD Analysis

CFD Study of Ceiling Fan Performance

Internal CFD Analysis to assess airflow performance of specific fan model and build within a generic 4-room residential in space, in Singapore.

CFD Study of Transformer Room within 66kV Substation in Singapore

Internal CFD Analysis to assess the heat dissipation of transformer unit, under Normal  Scenario. Study was done within a naturally-ventilated transformer bay in a 66kV substation. 

Complete with modelling, simulation, and report.

CFD Study of 3.6 MW Air and Liquid-cooled Data Hall in Batam, Indonesia

Internal CFD Analysis to assess performance of FWUs on data racks, under Failure Scenario. Study was done for a 3.6 MW air and liquid-cooled Data Hall, within a 64 MW six-storey Data Center facility. 

Complete with modelling, simulation, and report.

CFD Study of 6.4 MW Air and Liquid-cooled Data Hall in Jakarta, Indonesia

Internal CFD Analysis to assess performance of FWUs on data racks, under Normal and Failure Scenario.  Study was done for a 6.4 MW air and liquid-cooled data hall, within a 22.2 MW Data Center facility. 

Complete with modelling, simulation, and report.

Due Diligence Study of 5 MW Air and Liquid-cooled Data Hall in Samut Prakan, Thailand

Due Diligence Internal CFD Analysis to assess performance of FWUs on data racks, under Hot Standby Scenario. Study was done for a 5 MW air and liquid-cooled data hall, within a 50 MW data center facility.

Complete with modelling and simulation.

Due Diligence Study of 5 MW Air-cooled Data Hall in Samut Prakan, Thailand

Due Diligence Internal CFD Analysis to assess performance of FWUs on data racks, under Hot Standby Scenario. Study was done for a 5 MW air-cooled data hall, within a 50 MW data center facility.

Complete with modelling and simulation.

CFD Study of 5 MW Air and Liquid-cooled Data Hall in Bangkok, Thailand

Internal CFD Analysis to assess performance of FWUs on data racks, under Failure Scenario. Study was done for a 5 MW air and liquid-cooled data hall. Complete with modelling and simulation.

CFD Study of 10 MW Air and Liquid-cooled Data Hall in Daerah Kulai, Malaysia

Internal CFD Analysis to assess performance of FWUs on data racks, under Hot Standby and Failure Scenario. Study was done for a 5 MW air-cooled data hall, within a 80 MW data center facility.

Complete with modelling, simulation, and report.

CFD Study of 8 MW UPS Room in Daerah Kulai, Malaysia

Internal CFD Analysis to assess performance of CRAH units on UPS units, under Hot Standby  Scenario. Study was done for a 8 MW UPS room, within a 80 MW data center facility.

Complete with modelling, simulation, and report.

CFD Study of 6 MW Mechanical-Electrical Room in Daerah Kulai, Malaysia

Internal CFD Analysis to assess performance of CRAH units on UPS units and Isolation Transformers, under Hot Standby  Scenario. Study was done for a 6 MW Mechanical-Electrical room, within a 80 MW data center facility. Complete with modelling, simulation, and report.

Copyright © 2022 Hyperion i4 Global Solutions - All Rights Reserved.

Powered by