Past Projects: External CFD Analysis

CFD Study of High Rise Residential Development (HDB Flats) in Singapore

  External CFD Analysis to asses the effect of the highest prevailing wind speed on High-rise Residential Development, or HDB flats, in Singapore. Study was done for a conceptual HDB plot on Serangoon Road, Singapore.

CFD Study of 40 MW Data Center in Batam, Indonesia

External CFD Analysis to performance of Cooling Towers and Generators, under ASHRAE n=50 Extreme Temperature Conditions and two highest prevailing wind speed. Study was done for a 40 MW six-storey Data Center (two-modules) facility. 

Complete with modelling, simulation, and report.

CFD Study of 64 MW Data Center in Batam, Indonesia

External CFD Analysis to performance of Cooling Towers and Generators, under ASHRAE n=50 Extreme Temperature Conditions and two highest prevailing wind speed. Study was done for a 64 MW six-storey Data Center (three-modules) facility. 

Complete with modelling, simulation, and report.

CFD Study of 80 MW Data Center in Daerah Kulai, Malaysia

External CFD Analysis to performance of Cooling Towers and Generators, under ASHRAE n=50 Extreme Temperature Conditions and two highest prevailing wind speed. 

Study was done for a 80 MW Data Center facility.  

Complete with modelling, simulation, and report.

CFD Study of 96 MW Data Center in Johor Bahru, Malaysia

External CFD Analysis to performance of Air-cooled Chillers, Cooling Towers and Generators, under ASHRAE n=20 Extreme Temperature Conditions and two highest prevailing wind speed, with an additional scenario of calm wind condition. 

Study was done for a 96 MW two-storey Data Center facility.  Complete with modelling, simulation, and report.

CFD Study of 58 MW Data Center in Kuala Lumpur, Malaysia

External CFD Analysis to performance of Air-cooled Chillers and Generators, under ASHRAE n=20 Extreme Temperature Conditions and the highest prevailing wind speed, a wind direction parallel to the chillers, with an additional scenario of calm wind condition. 

Study was done for a 58 MW two-storey Data Center facility.  Complete with modelling, simulation, and report.